Sunday, August 8, 2010

Coffee Table

The back corner of the cabin is a great spot to sit for morning coffee so we added this little coffee table. Its also big enough for a laptop computer or a toasted bagel on a plate. Constructed from 1" Afromosia (African Teak), it hinges up for access to the little door where you check the engine oil. It removes completely with a couple of thumb screws for when you want to remove the stair and panel to access the engine room. Horizontal support comes from a stop mounted to the stair. An pin is available to hold the table in the up position while working through the small engine room door.

I was lucky to find a piece of Afromosia that was 15 inches wide allowing the table to be cut as a single piece. For now, no fiddles will be added. That may change later depending on how much junk gets dumped on the floor.

Saturday, August 7, 2010

Cockpit Table Extension


One of the first projects completed on SummerPlace was a small cockpit table that could be used while underway. One of the last projects was an extension leaf that allows 2 people to sit at a cockpit dinner table.

The extension is built from 3/4" plywood with a Formica top surface and teak edges. A square base fits closely into the fiddles on the small table and is retained by a screw-in knob. The whole thing removes for stowage in a few seconds. Its kept in the port lazarette in a case custom made by Sandy.

Shoestring Digital Voltmeter

A 2000 watt Honda generator is used on SummerPlace to maintain the batteries while on cruise but the analog panel meter doesn't help much. I wanted a digital meter but a replacement panel mount unit is ~$175 if one can be found to fit. Harbor Freight often has digital voltmeters on sale for three bucks. I wired this one up to a handy spot in the closet.

Now I can watch my batteries charge up without my checking account draining down.

Galley Shelf


There's adequate countertop space on Summer Place as long as you dont want to get into the ice box or bread box. The doors to those spaces also serve as counter top. While preparing meals, you often need to shift things around to pull something out of the refer. It was a juggling act. To help matters, I added a small shelf to gain a few square inches of precious horizontal space.

The shelf is constructed out of 1" thick Afromosia (African Teak) purchased locally. Afromosia is about half the cost of teak and provides a good match of grain and color. The shelf is supported by 2 small hinges and a hook.

Handy

Sunday, July 25, 2010

Jarrell Cove Sketches




I took my iPad on a recent cruise to Jarrell Cove. I snapped some photos of intersting boats (including SummerPlace of course!) and drew sketches from them on the iPad. Its an enjoyable activity for a cruise and a good way to strike up conversation with the other boaters. Click on the thumbnails above to see the full-size image on Flickr.


Wednesday, June 16, 2010

Outboard Motor Bracket

I needed an outboard motor bracket for the 8hp. Tohatsu used on the dink. I found two types to be available, a plastic or teak one that mounts at a rail intersection and costing $40 - $50., and one made by Edson that mounts anyplace the cost just under $300. (gasp!)

Having neither a rail intersection nor $300. to spare, I decided to make my own using Starboard. Total cost from TAP: $11.50 using a scrap of teak and assortment of screws from the junk box. Looks decent IMHO.

Friday, April 30, 2010

Swim Platform (Dinghy Davits)

Update: 6/15 - Completed work on the stand-offs the last few days. The project is complete. Tie-downs were also added on the starboard side for gas cans and several hours were spent figuring out how to best tie off the dinghy once up on the davits. I ended up running a line on each side, from below the centerline of the dinghy up to the middle of the stern rail. This has the effect of spreading the load and making the dinghy rock solid while underway..

Like most projects, if I were to do it again, there are a few minor things I'd do differently but I consider this effort to be a success. Now on to some new projects.


Installation Complete - 1Update: 6/1 - Wrapped up installation this morning with final hardware, transom backing, bedding, etc. The platform is solid underfoot owing to the cored construction of the transom and placement of the brackets. I'm pleased with the result. Next step brings the dinghy to the marina for mounting the davits and stand-offs.

Update: 5/30: Started installation yesterday. Progress is slow because of the steady rain. Should wrap up initial work tomorrow followed by disassembly and bedding of the hardware. Taking plenty of time to be sure everything is properly aligned before drilling the holes.

Update: 5/28 - The platform arrived yesterday from Plasteak. Two photos were added to the gallery. I asked PlasTeak to take a few photos of the platform during fabrication but it didn't get done.

The platform looks good although I'm a bit concerned about the proximity of the vents to the place where the davit hooks mount. I would have preferred more solid platform there. Should be ok with use of some good backing plates though.

Update: 5/19 - Added some new photos to the project gallery. The platform was ordered about 10 days ago and should be here in about another week. Meanwhile, I gathered much of the hardware needed to mount it on the transom.

I asked PlasTeak to take some photos during fabrication of the platform and hope to get some interesting shots of the process.

-------------------------

I've never gone swimming in Puget Sound and have no plans to do so. A swim platform is a great way to carry a hard dinghy though - using Weaver Snap Davits

With the boat kitty replenished by the previously reported davit sale, a swim platform is in the works. This platform will be a rehash of one I built of the Nonsuch 26 seen here. This one will be about 18 inches wider and use improved supports. I'll follow a similar prototype process by building a plywood mock-up to confirm the design and fit followed by a custom build by Plasteak.

This is a slow project spanning about two months. The slideshow below shows the progress and will be updated as work is completed. On each photo is a "notes" link below the image. Click on it to read any included explanation. You can also click on the "link" link to open up the full-size photo on Flickr.

Get the flash player here: http://www.adobe.com/flashplayer